WhatsApp

Engineering shaped around the product.

Three Bears Tech focuses on custom control boards and LED modules for product teams whose requirements cannot be met by a standard off-the-shelf board.

Send Your Requirements

One company behind both brands.

Three Bears Tech (threebearstech.com) and Three Bears LED (threebearsled.com) are operated by 深圳三只熊实业有限公司. The company is based in Fenghuang Industrial Area, Fuyong Subdistrict, Bao'an District, Shenzhen, Guangdong, China, and works in LED lighting and related products.

Three Bears Tech presents our custom control board and LED module development services. For inquiries and requests to access or delete inquiry information, contact our shared company mailbox at info@threebearstech.com. Read our Privacy Notice.

Connect the electrical, optical, mechanical, and production decisions.

A successful custom board must fit more than a schematic. It must work inside the product, support the required performance, and be prepared for the intended assembly and test context.

01 / APPLICATION FIRST

Start with what the product must do

Function, environment, space, power, interfaces, optical targets, and installation details define the development direction.

02 / CONNECTED DESIGN

Review the system as a whole

Control electronics and LED hardware are considered alongside enclosure, thermal path, wiring, connectors, and user interaction.

03 / DEFINED GATES

Make decisions visible

Requirements, deliverables, verification criteria, and approval points are clarified for the scope of each project.

A practical path from technical input to production handoff.

The exact activities and deliverables depend on the agreed project scope, the available reference material, and the validation the application requires.

01

Clarify the brief

Organize known requirements, identify missing inputs, and expose constraints before design decisions are locked.

02

Develop the right architecture

Define a project-specific approach for the circuit, PCB, LED configuration, interfaces, and physical integration.

03

Verify against agreed criteria

Use the project requirements to define what should be reviewed during prototype evaluation and before handoff.

04

Prepare usable project information

Organize the approved design and production information included in the agreed delivery scope.

Scope matters

Specific responsibilities, technical deliverables, source-file ownership, and verification work are confirmed for each project before development begins.